-

Cerritos College and ForeFront Power Complete Largest Community College Solar Canopy in the U.S.

The 6.5 MW solar canopy system will offset 82% of the College’s annual electricity use and is projected to save more than $25 million over 20 years.

NORWALK, Calif.--(BUSINESS WIRE)--Cerritos College and ForeFront Power, a leading developer and asset manager of commercial and industrial-scale solar energy and storage projects, celebrated the completion of a 6.5 megawatt-DC (MW-DC) solar canopy system at Cerritos College. Located entirely on campus, it is the largest single-campus solar canopy at a community college in the U.S.

“Every dollar we save on energy is a dollar we can reinvest in our students." - Felipe Lopez, EVP of Business Services, Cerritos College

Share

The new solar canopy project transforms Parking Lot 1 and Parking Lot 10 into shaded parking areas covered by solar panels. Each year the system will generate more than 10.8 million kilowatt-hours (kWh) of clean, renewable electricity, which is enough to cover the yearly electricity use of nearly 1,900 homes in the region.

This clean energy production will offset 82% of the College’s annual electrical consumption and approximately 5,475 metric tons of CO₂ emissions each year. That emissions reduction is equivalent to avoiding the annual emissions from more than 1,270 gasoline-powered vehicles driven for a year, creating a net positive for local air quality.

The project moves Cerritos College closer to its goal of becoming one of the greenest community colleges in the United States. It also supports the California Community Colleges Board of Governors’ Climate Change and Sustainability Policy, which requires community colleges to get at least 75% of their electricity from renewable sources by 2030. With the new canopy system activated, Cerritos College will exceed that benchmark years ahead of schedule.

“Every dollar we save on energy is a dollar we can reinvest in our students,” said Felipe Lopez, Executive Vice President of Business Services at Cerritos College. “This project reduces our operating costs while creating a more sustainable campus. Students can see that commitment in action every time they park beneath the solar canopies.”

Cerritos College developed this project with no upfront cost for the project and without tapping bond funds, thanks to a Power Purchase Agreement (PPA) with ForeFront Power. Under the PPA structure, ForeFront Power develops, finances, and owns the solar canopy system. In return, the College pays a fixed electricity rate that is lower than the utility’s rate and remains locked in for the full 20-year agreement, helping shield the College from future utility rate increases. Over the course of that period, the system is projected to save the College more than $25 million in energy costs. ForeFront Power will continue to operate and maintain the system at no additional cost, ensuring it performs optimally for the life of the project.

Partnering with an experienced developer allowed Cerritos College to deploy renewable energy faster while minimizing administrative burden to college staff. The College drew on ForeFront Power’s expertise in project development, financing, engineering, construction, and long-term operations. The result is reliable clean energy delivered more efficiently and cost-effectively for the College.

“Community colleges are under pressure to stretch every dollar while meeting ambitious clean energy goals,” said Ruben R. Fontes, CEO of ForeFront Power. “By taking two parking lots and turning them into the largest single-campus solar canopy at a community college in the U.S., Cerritos College shows how much value is sitting in spaces college campuses already own.”

The project reflects Cerritos College's commitment to delivering long-term value to its students and community through smart infrastructure investments. Generating renewable energy on-site reduces the College's reliance on utility-supplied electricity and helps lower operating costs over time. The energy savings gained from this solar energy system will free up funds that can be reallocated to academic programs and student services.

About Cerritos College

Cerritos College serves as a comprehensive community college for southeastern Los Angeles County. Communities within the college’s district include Artesia, Bellflower, Cerritos, Downey, Hawaiian Gardens, La Mirada, Norwalk, and portions of Bell Gardens, Lakewood, Long Beach, Santa Fe Springs and South Gate. Cerritos College offers nearly 300 degrees and certificates in nine divisions. Annually, more than 5,000 students successfully complete their course of studies, and enrollment currently averages 21,000 students. Visit Cerritos College online at www.cerritos.edu.

About ForeFront Power

ForeFront Power is a leading developer of commercial and industrial-scale (C&I) solar energy and battery storage projects in the U.S. and Mexico, also offering fleet electrification services. Over 15 years of working together, the ForeFront Power team has developed more than 1,900 behind-the-meter and community solar projects, totaling more than 1.6 gigawatt-DC of renewable electricity. ForeFront Power serves business, government, education, healthcare and community solar customers with a broad array of development, asset management and advisory services from its San Francisco headquarters and via teams based in New York, Mexico City, and across the U.S. For more information, visit https://www.forefrontpower.com.

Contacts

Media Contact

James Cortese

Gryphon Agency for ForeFront Power
media@forefrontpower.com

ForeFront Power

Details
Headquarters: San Francisco, CA
CEO: Dr. Ruben Fontes
Employees: 150
Organization: PRI

Release Versions

Contacts

Media Contact

James Cortese

Gryphon Agency for ForeFront Power
media@forefrontpower.com

More News From ForeFront Power

Port of Hueneme and ForeFront Power Energize Solar Carport, as Port Charges Forward to Zero Emissions by 2030

PORT HUENEME, Calif.--(BUSINESS WIRE)--The Port of Hueneme partnered with ForeFront Power, a leading developer and asset manager of commercial and industrial-scale solar energy and storage projects, to build a 913-kilowatt solar energy carport system over an automobile staging area near the Port of Hueneme/Oxnard Harbor District Administration building. Built at no upfront cost to the Port, the completed project will help stabilize electricity costs and reduce carbon emissions, contributing to...

County of Ventura and ForeFront Power Complete One of California’s Largest Solar Canopy-Plus-Storage Projects

VENTURA, Calif.--(BUSINESS WIRE)--The County of Ventura has partnered with ForeFront Power, a leading developer and asset manager of commercial and industrial-scale solar energy and storage projects, to develop a 7.7 megawatt-DC (MW-DC) solar energy and storage expansion project at the Ventura County Government Center.The 7.7 MW solar and storage project includes a 5.8 MW solar canopy parking system and a 1.9 MW battery storage component installed across Parking Lots “A” – “F” at the County Gove...

ForeFront Power Completes its First Erthos Solar Energy System for the City of Fresno

FRESNO, Calif.--(BUSINESS WIRE)--ForeFront Power, a leading developer and asset manager of commercial and industrial-scale renewable energy solutions, today announced that it has achieved commercial operation of its first Erthos solar energy system at the City of Fresno’s Northeast Surface Water Treatment Plant. Erthos distills the complexity of solar energy systems into a modular, repeatable design. Unlike traditional ground-mounted solar energy systems supported by structural steel, Erthos’ E...
Back to Newsroom