-

Granite Awarded $111 Million Utah DOT Project in Salt Lake City

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced it has been awarded a $111 million contract by the Utah Department of Transportation (UDOT) for a major infrastructure project in Salt Lake City. Project funding is to come from UDOT and Federal sources and will be included in Granite’s second quarter CAP.

The Interstate 215 (I-215); State Route 201 (SR-201) to North Temple project spans from milepost 19.53 to 22.8 and includes the rehabilitation of 3 miles of I-215, and 12 miles of ramps for SR-201, Interstate 80 (I-80), and California Avenue, along with the rehabilitation of 22 bridges.

“This project is multifaceted, encompassing a diverse array of components that span strategic planning, creative development, stakeholder engagement, and operational execution,” said Granite Vice President of Regional Operations Jason Klaumann. “It will keep Granite’s paving and structure crews busy through the winter and into the fall of 2026, further strengthening the company’s relationship with UDOT and positioning Granite as a key player in future large bid-build projects.”

Key elements of the project include:

  • Rubblizing existing Portland Cement Concrete Pavement (PCCP) and overlaying with 175,000 tons of highly modified hot mix asphalt (HMHMA)
  • Structural deck replacements, hydro demolition, and pothole patching across 22 bridges (18 deck replacements: 10 via hydro-demolition, 8 standard remove and replace)
  • Installation of 22,000 linear feet of storm drain
  • Ramp metering installation at California Avenue

Granite’s Walker Hot Plant will supply the 175,000 tons of HMHMA and 5,000 tons of temporary HMA required for the project.

Construction is expected to begin August 2025 and be completed November 2026.

About Granite

Granite is America’s Infrastructure Company™. Incorporated since 1922, Granite (NYSE:GVA) is one of the largest diversified construction and construction materials companies in the United States as well as a full-suite civil construction provider. Granite’s Code of Conduct and strong Core Values guide the Company and its employees to uphold the highest ethical standards. Granite is an industry leader in safety and an award-winning firm in quality and sustainability. For more information, visit the Granite website, graniteconstruction.com, and connect with Granite on LinkedIn, X, Facebook, and Instagram.

Contacts

Granite
Media
Erin Kuhlman - 831-768-4111
Investors
Wenjun Xu - 831-761-7861

Granite

NYSE:GVA

Release Versions

Contacts

Granite
Media
Erin Kuhlman - 831-768-4111
Investors
Wenjun Xu - 831-761-7861

More News From Granite

Granite Announces Timing of Earnings Release and Investor Conference Call

WATSONVILLE, Calif.--(BUSINESS WIRE)--July 15, 2026 -- Granite (NYSE: GVA) will release financial results for the quarter ended June 30, 2026, before market opens on Thursday, July 30, 2026. The Company will host an investor conference call at 8:00 a.m. PT, Thursday, July 30, 2026. The Company invites investors to listen to a live audio webcast of the investor conference call on its Investor Relations website, investor.graniteconstruction.com. The investor conference call will also be available...

Granite JV Wins Preconstruction CMAR Contract for Reno Bridge Project

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced today that Keystone Bridge Partners, a Granite-led joint venture with Condon-Johnson & Associates, Inc., has been selected by the Regional Transportation Commission (RTC) of Washoe County to provide preconstruction services for the Keystone Avenue Bridge Replacement Project in Reno, Nevada. The project will be delivered using the Construction Manager at Risk (CMAR) method. Built in 1966, the Keystone Avenue Bridge spans the T...

Granite Awarded West Davis Corridor Expansion Project in Utah

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced today that it has been awarded the West Davis Corridor (SR-177) expansion project by the Utah Department of Transportation (UDOT). The contract, valued at approximately $116.9 million, will be included in Granite’s second quarter 2026 CAP. Located in West Point, Utah, the project will: Extend the recently completed West Davis Corridor by approximately three miles Enhance mobility and connectivity for the northern Davis County ar...
Back to Newsroom