-

Granite Selected for Approximately $72 Million Project in Capitola, California

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) has been awarded an approximately $72 million contract by the California Department of Transportation (Caltrans) to build auxiliary lanes and bus-on-shoulder facilities on Highway 1 between Bay/Porter and State Park Drive in Capitola, California. Funded by the Santa Cruz County Regional Transportation Commission (SCCRTC), with Local Measure D-Highway Corridor funds, Senate Bill 1 grants, and other SCCRTC discretionary funds, the project was included in Granite's second quarter CAP.

The upcoming project will construct various critical components, including concrete retaining walls, noise reduction measures, storm drains, a bicycle and pedestrian bridge, and reconstruct a 165 ft long vehicle bridge adding bicycle and pedestrian features. The project is adjacent to Granite's previously awarded Highway 1 auxiliary lane and bus-on-shoulder project between 41st Avenue and Soquel, and centrally located between two of Granite’s materials facilities supporting our home market strategy and commitment to improving local transportation and accessibility.

Granite will recycle approximately 12,000 tons of existing asphalt and concrete into recycled aggregates and utilize approximately 88,000 tons of subbase & base from its local aggregate and recycled aggregate plants. 24,000 tons of hot mix asphalt (HMA) and 13,000 tons of rubberized HMA (a product that incorporates and recycles old tires) will be used from its Salinas Hot Plant, a certified Green Business, ensuring readily available high-quality materials and highlighting Granite's commitment to environmentally conscious practices and sustainability.

“Our team is thrilled to embark on these transformative projects to enhance the vital infrastructure along the Hwy 1 Corridor in Santa Cruz County, improving safety and accessibility for pedestrians and cyclists alike,” said Vice President of Regional Operations, Brent Fogg. “Our core values of excellence and safety will guide us to ensure minimal disruption to local traffic during construction. We eagerly anticipate the completion of these projects and the enhanced mobility they will provide our local community."

The project is planned to begin in September 2023 and is expected to be completed in Q3 2025.

About Granite

Granite is America’s Infrastructure Company™. Incorporated since 1922, Granite (NYSE:GVA) is one of the largest diversified construction and construction materials companies in the United States as well as a full-suite civil construction provider. Granite’s Code of Conduct and strong Core Values guide the Company and its employees to uphold the highest ethical standards. Granite is an industry leader in safety and an award-winning firm in quality and sustainability. For more information, visit the Granite website, graniteconstruction.com, and connect with Granite on LinkedIn, X, Facebook, and Instagram.

Contacts

Media
Erin Kuhlman 831-768-4111
Investors
Wenjun Xu - 831-761-7861

Granite

NYSE:GVA

Release Versions

Contacts

Media
Erin Kuhlman 831-768-4111
Investors
Wenjun Xu - 831-761-7861

More News From Granite

Granite Awarded $51.5 Million SCORE Rail Siding Projects in Southern California

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE: GVA) has been awarded a $51.5 million contract by the Southern California Regional Rail Authority (Metrolink) as part of the Southern California Optimized Rail Expansion (SCORE) program. The project will be included in Granite's fourth quarter 2026 CAP.The SCORE Bundled Marengo & Rancho Cucamonga Siding Extension Projects will construct two rail sidings, one near downtown Los Angeles and the other in Rancho Cucamonga. The improvements are...

Granite Selected for $52 Million CMAR Contract on the Airfield Safety Enhancement (ASE) Program at the Tucson International Airport

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced today it has been awarded a Construction Manager at Risk (CMAR) contract by the Tucson Airport Authority (TAA) for the CMAR2 project at Tucson International Airport in Tucson, Arizona. The project is valued at approximately $52 million and was included in Granite’s third quarter 2026 CAP. The CMAR2 project is the final project within TAA's Airfield Safety Enhancement (ASE) Program, a multi-year, more than $400 million initiative...

Granite Reports Third Quarter 2026 Results and Introduces 2029 Targets

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE: GVA) today announced results for the quarter ended September 30, 2026. Third Quarter 2026 Results Net income attributable to Granite totaled $3 million, or $0.07 per diluted share, compared to net income attributable to Granite of $103 million, or $1.98 per diluted share, for the same period in the prior year. Current period net income was unfavorably impacted by $162 million of net non-operating charges associated with settling the conversio...
Back to Newsroom