-

Agreements reached on trans-Guinean infrastructure in milestone for Simandou iron ore project

CONAKRY, Guinea--(BUSINESS WIRE)--Rio Tinto and the Simfer1 joint venture (Simfer) reached an important milestone today by concluding key agreements with the Republic of Guinea and Winning Consortium Simandou2 (WCS) on the trans-Guinean infrastructure for the world class Simandou iron ore project.

The Co-Development Convention with the Republic of Guinea and associated agreements adjusting Simfer and WCS’s existing mine conventions create the legal framework for the co-development of more than 600 kilometres of new multi-use rail together with port facilities, that will be used to export iron ore from the Simandou mining concessions in the southeast of the country.

Rio Tinto Executive Committee lead for Guinea and Copper Chief Executive Bold Baatar said “With these agreements we have reached an important milestone towards full sanction of the Simandou project, bringing together the complementary strengths and expertise of Rio Tinto and our partners, the Government of Guinea and Winning Consortium Simandou, for the infrastructure that will unlock this world class resource. Simandou, the world’s largest known undeveloped supply of high-grade, low-impurity iron ore, will strengthen Rio Tinto’s portfolio by complementing our existing Pilbara and Iron Ore Company of Canada products.”

The infrastructure capacity and associated cost will be shared equally between Simfer, which is developing blocks 3 and 4 of the Simandou project, and WCS, which is developing blocks 1 and 2. China Baowu Steel Group has also previously entered into a term sheet agreement with WCS that may see it partner in the WCS scope for blocks 1 and 2 of the Simandou mining concession and the infrastructure joint venture.

The Co-Development Convention requires ratification by the Guinean State. It is also subject to a number of conditions, including the Guinean State’s approval of the final feasibility study for the project. Negotiations continue between the partners to finalise the investment agreements and related shareholders’ agreements which underpin the co-development. A further announcement will be made when appropriate concerning these agreements.

Critical path works continue to be progressed by the partners to ensure progress is maximised during the 2023-24 dry season.

____________________
1 The Simfer joint venture comprises Simfer S.A., the holder of Simandou South Blocks 3 & 4, which is owned by the Government of Guinea (15%) and Simfer Jersey Limited (85%). In turn, Simfer Jersey Limited is a joint venture between the Rio Tinto Group (53%) and Chalco Iron Ore Holdings (47%) – a Chinalco-led joint venture of leading Chinese SOEs (Chinalco (75%), Baowu (20%), China Rail Construction Corporation (2.5%) and China Harbour Engineering Company (2.5%).
2 WCS is a consortium between Winning International Group (49.99%), Weiqiao Aluminium (part of the China Hongqiao Group) (49.99%) and United Mining Suppliers (0.0002%).

This announcement is authorised for release to the market by Steve Allen, Rio Tinto’s Group Company Secretary.

Contacts

Please direct all enquiries to media.enquiries@riotinto.com

Media Relations,
United Kingdom
Matthew Klar
M +44 7796 630 637
David Outhwaite
M +44 7787 597 493

Media Relations,
Australia
Matt Chambers
M +61 433 525 739
Jesse Riseborough
M +61 436 653 412
Alyesha Anderson
M +61 434 868 118

Media Relations,
Americas
Simon Letendre
M +1 514 796 4973
Malika Cherry
M +1 418 592 7293

Investor Relations,
United Kingdom
Menno Sanderse
M +44 7825 195 178
David Ovington
M +44 7920 010 978
Laura Brooks
M +44 7826 942 797

Investor Relations,
Australia
Tom Gallop
M +61 439 353 948
Amar Jambaa
M +61 472 865 948

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 43, 120 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

riotinto.com

Category: Simandou

Rio Tinto

LSE:RIO

Release Versions

Contacts

Please direct all enquiries to media.enquiries@riotinto.com

Media Relations,
United Kingdom
Matthew Klar
M +44 7796 630 637
David Outhwaite
M +44 7787 597 493

Media Relations,
Australia
Matt Chambers
M +61 433 525 739
Jesse Riseborough
M +61 436 653 412
Alyesha Anderson
M +61 434 868 118

Media Relations,
Americas
Simon Letendre
M +1 514 796 4973
Malika Cherry
M +1 418 592 7293

Investor Relations,
United Kingdom
Menno Sanderse
M +44 7825 195 178
David Ovington
M +44 7920 010 978
Laura Brooks
M +44 7826 942 797

Investor Relations,
Australia
Tom Gallop
M +61 439 353 948
Amar Jambaa
M +61 472 865 948

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 43, 120 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

riotinto.com

Category: Simandou

More News From Rio Tinto

Rhodes Ridge Joint Venture partners begin $191 million feasibility study on up to 50Mtpa Pilbara iron ore mine

PERTH, Australia--(BUSINESS WIRE)--The Rhodes Ridge Joint Venture has approved a $191 million (A$294 million) (Rio Tinto share $96 million, A$147 million) feasibility study to progress development of the first phase of the Rhodes Ridge project, one of the world’s best undeveloped iron ore deposits, in Western Australia’s Pilbara. The feasibility study will assess development of an operation with initial annual production capacity of 40 to 50 million tonnes of iron ore. The joint venture partner...

Yinhawangka Aboriginal Corporation and Rio Tinto sign Interim Modernised Agreement

PERTH, Australia--(BUSINESS WIRE)--Yinhawangka Aboriginal Corporation and Rio Tinto have signed an Interim Modernised Agreement, marking an important step in their long-standing relationship. This interim agreement builds on the 2013 Participation Agreement between the Yinhawangka People and Rio Tinto. It sets out how both parties will work together and establishes a pathway to a fuller modernised agreement that will govern how Rio Tinto operates on Yinhawangka Country for the long term. The ag...

Rio Tinto’s first Pilbara-made rail car built by Gemco in Karratha

KARRATHA, Australia--(BUSINESS WIRE)--Rio Tinto’s first Pilbara-made iron ore rail car has rolled off the production line in Karratha, as part of a A$150 million partnership with Australian rail industry supplier Gemco Rail to build 100 rail cars in Western Australia and to support local manufacturing. The first Karratha-made rail car follows the completion of 40 Western Australian-made iron ore rail cars under the partnership at Gemco Rail’s Perth facility earlier this year, with the remaining...
Back to Newsroom