-

Update on Rio Tinto Kennecott after SLC earthquake

LONDON--(BUSINESS WIRE)--Rio Tinto’s Kennecott mine near Salt Lake City (SLC), Utah, was today impacted as a result of a 5.7-magnitude earthquake close to the town of Magna. All employees have been safely accounted for and evacuated from the potential risk areas. At this stage we have identified limited damage to the operation or risk to the surrounding community. A detailed inspection of the complex is currently being conducted, in conjunction with the local emergency services and Utah Department of Transportation.

As a precaution, all operations have been temporarily halted and, in line with standard procedures pre-agreed with the Utah Department of Transportation, State Road 201 has been temporarily closed while the inactive South (Magna) tailings storage facility is inspected. This is an inactive historic tailings storage facility that is stable and being actively monitored and managed, under a plan reviewed and endorsed by a panel of independent geotechnical experts and Utah’s dam regulatory authorities.

Rio Tinto Copper & Diamonds chief executive Arnaud Soirat said “The safety of our employees and wider community is our first priority and having ensured that all our employees are safe and the operations are shut, we are now working with the local emergency services and regulators to ensure the asset is safe before resuming any operations.”

Contacts

media.enquiries@riotinto.com
riotinto.com

Follow @RioTinto on Twitter

Media Relations, United Kingdom
Illtud Harri
M +44 7920 503 600

David Outhwaite
T +44 20 7781 1623
M +44 7787 597 493

Media Relations, Americas
Matthew Klar
T +1 514 608 4429

Media Relations, Asia
Grant Donald
T +65 6679 9290
M +65 9722 6028

Media Relations, Australia
Jonathan Rose
T +61 3 9283 3088
M +61 447 028 913

Matt Chambers
T +61 3 9283 3087
M +61 433 525 739

Jesse Riseborough
T +61 8 6211 6013
M +61 436 653 412

Investor Relations, United Kingdom
Menno Sanderse
T: +44 20 7781 1517
M: +44 7825 195 178

David Ovington
T +44 20 7781 2051
M +44 7920 010 978

Investor Relations, Australia
Natalie Worley
T +61 3 9283 3063
M +61 409 210 462

Amar Jambaa
T +61 3 9283 3627
M +61 472 865 948

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 7, 360 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

Category: Kennecott

Rio Tinto

LSE:RIO

Release Versions

Contacts

media.enquiries@riotinto.com
riotinto.com

Follow @RioTinto on Twitter

Media Relations, United Kingdom
Illtud Harri
M +44 7920 503 600

David Outhwaite
T +44 20 7781 1623
M +44 7787 597 493

Media Relations, Americas
Matthew Klar
T +1 514 608 4429

Media Relations, Asia
Grant Donald
T +65 6679 9290
M +65 9722 6028

Media Relations, Australia
Jonathan Rose
T +61 3 9283 3088
M +61 447 028 913

Matt Chambers
T +61 3 9283 3087
M +61 433 525 739

Jesse Riseborough
T +61 8 6211 6013
M +61 436 653 412

Investor Relations, United Kingdom
Menno Sanderse
T: +44 20 7781 1517
M: +44 7825 195 178

David Ovington
T +44 20 7781 2051
M +44 7920 010 978

Investor Relations, Australia
Natalie Worley
T +61 3 9283 3063
M +61 409 210 462

Amar Jambaa
T +61 3 9283 3627
M +61 472 865 948

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 7, 360 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

Category: Kennecott

More News From Rio Tinto

BHP and Rio Tinto welcome first Caterpillar battery-electric haul trucks to the Pilbara

PERTH, Australia--(BUSINESS WIRE)--Australia’s first Cat® 793 XE Early Learner battery-electric haul trucks have arrived at BHP’s Jimblebar iron ore mine in the Pilbara, marking the start of on-site testing, in collaboration with Rio Tinto, of Caterpillar’s battery-electric heavy haulage technology in the region that powers the nation’s economy. The two Early Learner trucks, delivered through an industry-first collaboration between BHP, Rio Tinto and Caterpillar represent a major step toward a...

Rio Tinto’s Nuton technology produces first copper

TUCSON, Arizona--(BUSINESS WIRE)--Rio Tinto has successfully produced the first copper from the Johnson Camp mine in Arizona using its Nuton® Technology, marking a pivotal step forward in the development of this innovative copper processing technology. After more than 30 years of research and development, the first copper cathode using Rio Tinto’s proprietary bioleaching technology, which relies on microorganisms grown on site, was produced at Gunnison Copper’s Johnson Camp mine last month. The...

Stronger, sharper and simpler Rio Tinto to deliver leading returns

LONDON--(BUSINESS WIRE)--Rio Tinto will today outline its strategy to deliver industry leading returns by becoming stronger, sharper and simpler, at its 2025 Capital Markets Day. Chief Executive Simon Trott and members of the executive team will detail how Rio Tinto will unlock its full potential to become the most valued metals and mining business through a strategy that starts with having the right assets in the right markets, supported by a diversified model that delivers market-leading perf...
Back to Newsroom