-

Peak+ Announces New Adiabatic Pre-Cooling Form Factor for Data Centers

The new Peak+ CORE system can be factory-installed on v-coil style chillers and dry coolers, accelerating time-to-revenue for data center developers seeking incremental power for additional IT loads, reduced PPUE, and solutions for failing external CFDs

MEMPHIS, Tenn.--(BUSINESS WIRE)--Peak+, a developer and manufacturer of precision adiabatic pre-cooling technologies that enhance air-cooled condenser performance and operational reliability, today announced the launch of the Peak+ CORE pre-cooling system. This new system integrates directly into air-cooled chillers and other air-cooled equipment and supports factory installation.

Higher power densities in data center campuses mean greater challenges for facility heat rejection, evidenced by increasingly common failing external CFDs. The CORE system is specifically designed for high-temperature environments, where it is critical to suppress condenser entering air temperatures (CEAT) to the chiller system design temperature, or below, to avoid chiller performance derate.

As with all Peak+ adiabatic pre-cooling systems, CORE can achieve and maintain a specific targeted cooled dry bulb CEAT, enabling operators to minimize water use.

“Data centers of all sizes are facing the same pressures: more heat, higher opportunity costs of misused energy, and increasing focus on water stewardship,” said Chris Curry, CEO at Peak+. “The Peak+ CORE system is what the market has been asking for—factory-installable, precise, and robust adiabatic pre-cooling – whether that is a new construction project or an existing facility looking to upgrade.”

The CORE system is designed to meet the needs of air-cooled chiller OEMs and data center operators and can be installed at the OEM factory or at off-site pre-fab facilities, minimizing on-site assembly and integration work. The CORE frames, which are positioned directly in front of condenser coils on v-coil style air-cooled chillers and other air-cooled condensers and radiators, can also be field-installed on existing equipment.

The CORE system joins the Peak+ product line alongside Peak+’s existing external frame- based pre-cooling system, which will now be known as HALO. Both HALO and CORE leverage Peak+’s unparalleled technical foundation and proprietary technologies, based on 300+ US installations, including dozens of data centers, and Peak+’s operational knowledge base with millions of real-world data points. Peak+ systems enable customers to:

  • Solve for failing external CFDs
  • Reduce peak PUE to increase IT yield
  • Protect condenser coils
  • Mitigate hot air recirculation and chiller derate
  • Increase chiller peak cooling capacity by up to 40%
  • Reduce chiller compressor energy by up to 50%

All Peak+ systems are proudly designed, engineered, and manufactured in the USA, and Peak+ deploys its own team to commission every site.

Customers can order the CORE system directly from Peak+ or coordinate with most major HVAC OEMs.

About Peak+

Peak+ designs, engineers, manufactures, and commissions innovative, robust, and precise adiabatic pre-cooling technology to pre-cool air before it crosses the condenser coils of air-cooled equipment. Peak+ systems result in significant energy savings, reduced peak energy demand, extended equipment life, and reduced carbon footprint. The Peak+ team works alongside customer teams to provide proven solutions that meet each customer’s use case requirements, by harnessing evaporative cooling benefits with an intense focus on minimal water use and proper water stewardship. With robust precision, Peak+ systems optimize the achievement of target cooled dry bulb temperatures in front of condenser coils, using advanced algorithms, real-time data, optimized controls, and rapid-response US-based supply chain.

For additional information see www.peakplus.energy

Contacts

Company
Paul Heapy
VP Mission Critical
pheapy@peakplus.energy
(801) 836-5494

Media
Adam Waitkunas
Milldam Public Relations
adam.waitkunas@milldampr.com
(978) 828-8304

Peak+


Release Versions

Contacts

Company
Paul Heapy
VP Mission Critical
pheapy@peakplus.energy
(801) 836-5494

Media
Adam Waitkunas
Milldam Public Relations
adam.waitkunas@milldampr.com
(978) 828-8304

Back to Newsroom