-

Robe River Joint Venture to invest $733 million to extend West Angelas iron ore mine in Western Australia

PERTH, Australia--(BUSINESS WIRE)--Rio Tinto, Mitsui and Nippon Steel will invest $733 million1 (Rio Tinto share $389 million) to develop the West Angelas Sustaining Project, part of the Robe River Joint Venture in Western Australia’s Pilbara region.

The project, to develop new iron ore deposits in the West Angelas hub, has now received all necessary State and Federal Government approvals.

The deposits will maintain the West Angelas hub’s total annual production capacity of 35 million tonnes, extending mining activity for years to come.

Rio Tinto Iron Ore Chief Executive Matthew Holcz said: "The West Angelas Sustaining Project is built on strong and committed partnerships, both with the joint venture members Mitsui and Nippon Steel, as well as the Yinhawangka and Ngarlawangga Peoples.

"The West Angelas hub has been an integral part of Rio Tinto Iron Ore since 2002. Securing these approvals ensures ongoing investment in the hub as we continue to supply high-quality, reliable iron ore to meet our global customers' demand now and into the future."

Rio Tinto worked closely with the Yinhawangka and Ngarlawangga Peoples to co-design Social Cultural Heritage Management Plans for the West Angelas Sustaining Project to ensure the ongoing protection and management of cultural heritage and the environment.

The project will leverage existing West Angelas processing infrastructure and includes the construction of new non-process infrastructure precincts and 22-kilometres of haul roads.

Ore mined at the new deposits will be autonomously trucked to the West Angelas hub, with first ore scheduled for 2027.

About 600 jobs will be created during construction. Once operational, the project will help sustain a workforce of about 950 full time equivalent roles at the West Angelas hub.

The West Angelas Sustaining Project is part of Rio Tinto’s tranche of replacement projects that underpin the company’s ongoing commitment to the Pilbara, and which will have combined total capacity of about 130Mtpa2.

Additionally, work is well progressed on the pre-feasibility study for Rhodes Ridge, one of the world’s largest and highest quality undeveloped iron ore deposits, which is targeting an initial capacity of up to 40Mtpa and first ore by 2030.

Additional information

The Robe River Joint Venture comprises Rio Tinto (53 per cent), Mitsui Iron Ore (33 per cent) and Nippon Steel (14 per cent).

The Joint Venture dates back to 1972, when operations began in the Robe Valley near Pannawonica, followed by an expansion at West Angelas in 2002. It marked its 50th anniversary in 2022.

Footnotes

1 All currency figures are in US dollars and on a 100 per cent basis, unless otherwise specified. The capital for the project is already included in the Group’s replacement capital guidance.

2 Subject to timing of full capacity. The replacement projects include Western Range which, as previously announced, was opened on 6 June 2025, Brockman Syncline 1, as announced on 6 March 2025, Hope Downs 2, as announced on 24 June 2025, West Angelas (this project) and Greater Nammuldi.

This announcement is authorised for release to the market by Andy Hodges, Rio Tinto’s Group Company Secretary.

Contacts

Please direct all enquiries to media.enquiries@riotinto.com

Media Relations,
United Kingdom
Matthew Klar
M +44 7796 630 637
David Outhwaite
M +44 7787 597 493

Media Relations,
Australia
Matt Chambers
M +61 433 525 739
Rachel Pupazzoni
M +61 438 875 469
Bruce Tobin
M +61 419 103 454

Media Relations,
Canada
Simon Letendre
M +1 514 796 4973
Malika Cherry
M +1 418 592 7293
Vanessa Damha
M +1 514 715 2152

Media Relations,
US & Latin America

Jesse Riseborough
M +1 202 394 9480

Investor Relations,
United Kingdom
Rachel Arellano
M: +44 7584 609 644
David Ovington
M +44 7920 010 978
Laura Brooks
M +44 7826 942 797
Weiwei Hu
M +44 7825 907 230

Investor Relations,
Australia
Tom Gallop
M +61 439 353 948
Phoebe Lee
M +61 413 557 780

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 43, 120 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

riotinto.com

Category: General

Rio Tinto

LSE:RIO

Release Versions

Contacts

Please direct all enquiries to media.enquiries@riotinto.com

Media Relations,
United Kingdom
Matthew Klar
M +44 7796 630 637
David Outhwaite
M +44 7787 597 493

Media Relations,
Australia
Matt Chambers
M +61 433 525 739
Rachel Pupazzoni
M +61 438 875 469
Bruce Tobin
M +61 419 103 454

Media Relations,
Canada
Simon Letendre
M +1 514 796 4973
Malika Cherry
M +1 418 592 7293
Vanessa Damha
M +1 514 715 2152

Media Relations,
US & Latin America

Jesse Riseborough
M +1 202 394 9480

Investor Relations,
United Kingdom
Rachel Arellano
M: +44 7584 609 644
David Ovington
M +44 7920 010 978
Laura Brooks
M +44 7826 942 797
Weiwei Hu
M +44 7825 907 230

Investor Relations,
Australia
Tom Gallop
M +61 439 353 948
Phoebe Lee
M +61 413 557 780

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 43, 120 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

riotinto.com

Category: General

More News From Rio Tinto

Rio Tinto signs new wind power deal for Kennecott

SALT LAKE CITY--(BUSINESS WIRE)--Rio Tinto’s Kennecott operation has progressed its decarbonisation objectives by signing a 15-year virtual power purchase agreement (VPPA) with TerraGen for renewable energy from a newly completed wind farm in Texas. Under the agreement, Rio Tinto will purchase 78.5 megawatts (MW) of renewable energy generated by TerraGen’s 238.5 MW Monte Cristo I Windpower project. Commercial operations were commemorated with a ribbon cutting ceremony on site today. Rio Tinto K...

Simandou partners celebrate start of operations

CONAKRY, Guinea--(BUSINESS WIRE)--The President of the Republic of Guinea today joined project partners WCS1, Baowu, Chinalco and Rio Tinto in a ceremony at the port in Forécariah prefecture to mark the start of operations at Simandou, Africa’s largest greenfield integrated mine and infrastructure project. The project is delivering more than 600 kilometres of new multi-use trans-Guinean rail together with barge and Transhipment Vessel port facilities. Following commissioning and ramp up, this i...

Rio Tinto and China’s State Power Investment Corporation launch battery swap truck trial fleet at Oyu Tolgoi mine

ULAANBAATAR, Mongolia--(BUSINESS WIRE)--Rio Tinto and China’s State Power Investment Corporation (SPIC) Qiyuan have launched a trial of battery swap electric haul truck technology at the Oyu Tolgoi copper mine in Mongolia. The trial is Rio Tinto’s first use of battery swap electric haul trucks in surface mining operations. This is a major step towards developing the cost-effective technology and operational learnings required to reduce emissions from mining haulage fleets – one of the largest c...
Back to Newsroom