-

Rio Tinto purchases first battery-electric trains for the Pilbara

PERTH, Australia--(BUSINESS WIRE)--Rio Tinto has agreed to purchase four battery-electric trains for use in the Pilbara region of Western Australia as part of the company’s strategy to reduce its carbon emissions by 50 per cent by 2030.

Rio Tinto purchased the four 7MWh FLXdrive battery-electric locomotives from Wabtec Corporation with production due to commence in the United States in 2023 ahead of initial trials in the Pilbara in early 2024.

The locomotives, used to carry ore from the company’s mines to its ports, will be recharged at purpose-built charging stations at the port or mine. They will also be capable of generating additional energy while in transit through a regenerative braking system which takes energy from the train and uses it to recharge the onboard batteries.

A full transition to net zero emissions technology of its entire fleet of rail locomotives would reduce Rio Tinto Iron Ore’s diesel-related carbon emissions in the Pilbara by around 30 per cent annually.

Rio Tinto Managing Director of Port, Rail and Core Services Richard Cohen said delivery of the prototype locomotives will be an important early step for the company on the path toward a decarbonised Pilbara.

“Our partnership with Wabtec is an investment in innovation and an acknowledgement of the need to increase the pace of our decarbonisation efforts.

“Battery-electric locomotives offer significant potential for emissions reduction in the near term as we seek to reduce our Scope 1 & 2 carbon emissions in the Pilbara by 50 per cent by 2030.”

Rogerio Mendonca, President of Freight Equipment for Wabtec, said the FLXdrive is ideally suited to support Rio Tinto’s decarbonisation targets.

“This locomotive provides the power, fuel savings and emissions reductions to cost-effectively run rail networks in the mining industry. The rapid adoption of the FLXdrive by Rio Tinto and other mining operators demonstrates the industry’s commitment to decarbonising their operations.”

Once delivered, the locomotives will be trialled within controlled environments in the Pilbara and tested against a range of safety and functional criteria, including integration with AutoHaul™.

This flagship project reaffirms Rio Tinto’s commitment to significantly reducing carbon emissions by switching to renewable power and rolling out electric mobile fleets across the Pilbara.

 

Contacts

Please direct all enquiries to
media.enquiries@riotinto.com

Media Relations, Australia

Jonathan Rose
M +61 447 028 913

Matt Chambers
M +61 433 525 739

Jesse Riseborough
M +61 436 653 412

Jamie Macdonald
M +61 467 725 517

Kate Barcham
M +61 438 990 238

Rio Tinto plc

6 St James’s Square
London SW1Y 4AD
United Kingdom

T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited

Level 7, 360 Collins Street
Melbourne 3000
Australia

T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

riotinto.com

Category: Pilbara

Rio Tinto

ASX:RIO

Release Versions

Contacts

Please direct all enquiries to
media.enquiries@riotinto.com

Media Relations, Australia

Jonathan Rose
M +61 447 028 913

Matt Chambers
M +61 433 525 739

Jesse Riseborough
M +61 436 653 412

Jamie Macdonald
M +61 467 725 517

Kate Barcham
M +61 438 990 238

Rio Tinto plc

6 St James’s Square
London SW1Y 4AD
United Kingdom

T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited

Level 7, 360 Collins Street
Melbourne 3000
Australia

T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

riotinto.com

Category: Pilbara

More News From Rio Tinto

Rio Tinto and AMG Metals & Materials to assess low-carbon aluminium project in India

LONDON--(BUSINESS WIRE)--Rio Tinto and AMG Metals & Materials (AMG M&M), an energy transition solutions provider, have signed a Memorandum of Understanding (MOU) to jointly assess the feasibility of developing an integrated low-carbon aluminium project powered by renewable energy in India. AMG M&M is promoted by the two founders of Greenko and AM Green. Together, the parties will consider the potential development of up to a 1 million tonnes per annum (Mtpa) primary aluminium smelte...

Rio Tinto releases first quarter 2025 production results

MELBOURNE, Australia--(BUSINESS WIRE)--Rio Tinto Chief Executive Jakob Stausholm said: “We continued to see strong operational improvement with the Oyu Tolgoi copper mine and our bauxite operations delivering record months for production in March. Production was affected, however, by extreme weather events that impacted our Pilbara iron ore operations. “We are making excellent progress with our major projects to deliver profitable organic growth. We achieved first iron ore at Western Range in t...

Rio Tinto increases Australian supplier spend to A$17.7 billion

MELBOURNE, Australia--(BUSINESS WIRE)--Rio Tinto strengthened its spend with Australian businesses to over A$17.7 billion in 2024, supporting both national and local suppliers. This is an increase of 9.9% from the previous year and was spent with more than 6,000 suppliers across the country. This spend has helped boost local, regional, and national economies, contributing to employment and strengthening Australian owned and managed businesses. As part of this spend, more than A$926 million was...
Back to Newsroom