-

Rio Tinto purchases first battery-electric trains for the Pilbara

PERTH, Australia--(BUSINESS WIRE)--Rio Tinto has agreed to purchase four battery-electric trains for use in the Pilbara region of Western Australia as part of the company’s strategy to reduce its carbon emissions by 50 per cent by 2030.

Rio Tinto purchased the four 7MWh FLXdrive battery-electric locomotives from Wabtec Corporation with production due to commence in the United States in 2023 ahead of initial trials in the Pilbara in early 2024.

The locomotives, used to carry ore from the company’s mines to its ports, will be recharged at purpose-built charging stations at the port or mine. They will also be capable of generating additional energy while in transit through a regenerative braking system which takes energy from the train and uses it to recharge the onboard batteries.

A full transition to net zero emissions technology of its entire fleet of rail locomotives would reduce Rio Tinto Iron Ore’s diesel-related carbon emissions in the Pilbara by around 30 per cent annually.

Rio Tinto Managing Director of Port, Rail and Core Services Richard Cohen said delivery of the prototype locomotives will be an important early step for the company on the path toward a decarbonised Pilbara.

“Our partnership with Wabtec is an investment in innovation and an acknowledgement of the need to increase the pace of our decarbonisation efforts.

“Battery-electric locomotives offer significant potential for emissions reduction in the near term as we seek to reduce our Scope 1 & 2 carbon emissions in the Pilbara by 50 per cent by 2030.”

Rogerio Mendonca, President of Freight Equipment for Wabtec, said the FLXdrive is ideally suited to support Rio Tinto’s decarbonisation targets.

“This locomotive provides the power, fuel savings and emissions reductions to cost-effectively run rail networks in the mining industry. The rapid adoption of the FLXdrive by Rio Tinto and other mining operators demonstrates the industry’s commitment to decarbonising their operations.”

Once delivered, the locomotives will be trialled within controlled environments in the Pilbara and tested against a range of safety and functional criteria, including integration with AutoHaul™.

This flagship project reaffirms Rio Tinto’s commitment to significantly reducing carbon emissions by switching to renewable power and rolling out electric mobile fleets across the Pilbara.

 

Contacts

Please direct all enquiries to
media.enquiries@riotinto.com

Media Relations, Australia

Jonathan Rose
M +61 447 028 913

Matt Chambers
M +61 433 525 739

Jesse Riseborough
M +61 436 653 412

Jamie Macdonald
M +61 467 725 517

Kate Barcham
M +61 438 990 238

Rio Tinto plc

6 St James’s Square
London SW1Y 4AD
United Kingdom

T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited

Level 7, 360 Collins Street
Melbourne 3000
Australia

T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

riotinto.com

Category: Pilbara

Rio Tinto

ASX:RIO

Release Versions

Contacts

Please direct all enquiries to
media.enquiries@riotinto.com

Media Relations, Australia

Jonathan Rose
M +61 447 028 913

Matt Chambers
M +61 433 525 739

Jesse Riseborough
M +61 436 653 412

Jamie Macdonald
M +61 467 725 517

Kate Barcham
M +61 438 990 238

Rio Tinto plc

6 St James’s Square
London SW1Y 4AD
United Kingdom

T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited

Level 7, 360 Collins Street
Melbourne 3000
Australia

T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

riotinto.com

Category: Pilbara

More News From Rio Tinto

Rhodes Ridge Joint Venture partners begin $191 million feasibility study on up to 50Mtpa Pilbara iron ore mine

PERTH, Australia--(BUSINESS WIRE)--The Rhodes Ridge Joint Venture has approved a $191 million (A$294 million) (Rio Tinto share $96 million, A$147 million) feasibility study to progress development of the first phase of the Rhodes Ridge project, one of the world’s best undeveloped iron ore deposits, in Western Australia’s Pilbara. The feasibility study will assess development of an operation with initial annual production capacity of 40 to 50 million tonnes of iron ore. The joint venture partner...

Yinhawangka Aboriginal Corporation and Rio Tinto sign Interim Modernised Agreement

PERTH, Australia--(BUSINESS WIRE)--Yinhawangka Aboriginal Corporation and Rio Tinto have signed an Interim Modernised Agreement, marking an important step in their long-standing relationship. This interim agreement builds on the 2013 Participation Agreement between the Yinhawangka People and Rio Tinto. It sets out how both parties will work together and establishes a pathway to a fuller modernised agreement that will govern how Rio Tinto operates on Yinhawangka Country for the long term. The ag...

Rio Tinto’s first Pilbara-made rail car built by Gemco in Karratha

KARRATHA, Australia--(BUSINESS WIRE)--Rio Tinto’s first Pilbara-made iron ore rail car has rolled off the production line in Karratha, as part of a A$150 million partnership with Australian rail industry supplier Gemco Rail to build 100 rail cars in Western Australia and to support local manufacturing. The first Karratha-made rail car follows the completion of 40 Western Australian-made iron ore rail cars under the partnership at Gemco Rail’s Perth facility earlier this year, with the remaining...
Back to Newsroom