-

Lunda Construction Team Awarded $220 Million I-70 Missouri River Bridge Design-Build Project

LOS ANGELES--(BUSINESS WIRE)--Tutor Perini Corporation (NYSE: TPC) (the “Company”), a leading civil, building and specialty construction company, announced today that a design-build team led by its subsidiary, Lunda Construction Company (“Lunda”), has been selected by the Missouri Department of Transportation for the design and construction of the new I-70 Missouri River Bridge near Rocheport, Missouri. Lunda’s design team is comprised of Parsons Corporation (NYSE: PSN), Dan Brown & Associates and HZ United. The project consists of the design and construction of two Missouri River bridges, one in each direction of travel, each with three lanes, which will allow for construction to take place with a limited impact to traffic. Lunda is also replacing the County Road BB Bridge over I-70.

Design work is expected to commence shortly after contracts are executed, with construction scheduled to begin later this year and substantial completion expected by the end of 2024. The construction budget for this project is $220 million. The contract value is anticipated to be included in the Company’s third-quarter 2021 backlog.

About Tutor Perini Corporation

Tutor Perini Corporation is a leading civil, building and specialty construction company offering diversified general contracting and design-build services to private clients and public agencies throughout the world. We have provided construction services since 1894 and have established a strong reputation within our markets by executing large, complex projects on time and within budget while adhering to strict quality control measures.

Contacts

Tutor Perini Corporation
Jorge Casado, 818-362-8391
Vice President, Investor Relations and Corporate Communications
www.tutorperini.com

Tutor Perini Corporation

NYSE:TPC

Release Versions

Contacts

Tutor Perini Corporation
Jorge Casado, 818-362-8391
Vice President, Investor Relations and Corporate Communications
www.tutorperini.com

More News From Tutor Perini Corporation

Lunda Construction is the Apparent Low Bidder on a $28.6 Million Project on Highway 243

BLACK RIVER FALLS, Wis.--(BUSINESS WIRE)--Tutor Perini Corporation (NYSE: TPC) (the “Company”), a leading civil, building and specialty construction company, announced today that its subsidiary, Lunda Construction (“Lunda”), has been identified by the Minnesota Department of Transportation as the apparent low bidder for Project SP 1311-06. Lunda’s bid value is $28,551,380. The project is in Chisago (MN) and Polk (WI) Counties on Highway 243 from 0.25 miles west of the St. Croix River to Cascade...

Lunda Construction Awarded $33.4 Million Project on Highway 77

BLACK RIVER FALLS, Wis.--(BUSINESS WIRE)--Tutor Perini Corporation (NYSE: TPC) (the “Company”), a leading civil, building and specialty construction company, announced today that its subsidiary, Lunda Construction (“Lunda”), has been awarded a contract valued at $33,446,403 by the Minnesota Department of Transportation for Project SP 2758-75. The project is in Hennepin and Dakota Counties on Highway 77 from Nicols Road to American Boulevard. The scope of work includes grading, concrete and bitum...

Lunda Construction Awarded Roberts Street Railroad Bridge Replacement Project in Minnesota

BLACK RIVER FALLS, Wisc.--(BUSINESS WIRE)--Tutor Perini Corporation (NYSE: TPC) (the “Company”), a leading civil, building and specialty construction company, announced today that its subsidiary, Lunda Construction, has been awarded the Roberts Street Railroad Bridge Replacement Project over the Mississippi River. The project is situated in St. Paul, Minnesota.The project will replace a 113-year-old vertical lift 189-foot-long truss bridge with a new 215-foot-long rolling bascule truss span brid...
Back to Newsroom