Rio Tinto updates details of tailings facilities

LONDON--(BUSINESS WIRE)--Rio Tinto today released updated information in relation to its global tailings facilities to align with the requirements of the Global Industry Standard for Tailings Management (GISTM) released in August 2020, an initiative co-convened by the International Council on Mining and Metals, United Nations Environment Programme and the Principles for Responsible Investment.

The latest disclosure at http://www.riotinto.com/tailings builds on previously disclosed information on each of Rio Tinto’s global tailings facilities released in June 2019 and the publication of Rio Tinto’s Group Procedure and updated Standard for 'Management of tailings and water storage facilities' in February 2019. The changes to existing data are in line with guidance contained in GISTM including updating information previously disclosed.

As per the June 2019 disclosure, all facilities have been awarded a consequence classification in accordance with the regulatory or industry body that oversees tailings in each region or jurisdiction. Additional technical data from recently updated downstream impact assessments required under the GISTM and Rio Tinto’s own internal Tailings standard have resulted in a modification to hazard classifications of some facilities within the company’s global operations. Consequence classifications are not a rating of the condition of a facility or the likelihood of failure but on the potential consequence if there were to be a failure.

All Rio Tinto managed facilities are subject to three levels of governance and assurance:

  • First level of assurance takes place at the asset itself with the main tenets being effective facility design, comprehensive operational controls and regular reviews. Independent reviews of the operations must be conducted at least every two years
  • Second level is assurance to the Rio Tinto Standard through periodic Business Conformance Audits and Technical Reviews, supported by Rio Tinto's Surface Mining Centre of Excellence
  • Third level of assurance is independent of site management and normally conducted by third parties. In addition, all Rio Tinto managed facilities, whether active or inactive, have an external engineer of record or design engineer.

Full details of all Rio Tinto tailings and water storage facilities are available at https://www.riotinto.com/tailings.

riotinto.com

Category: General

Contacts

Please direct all enquiries to media.enquiries@riotinto.com

Media Relations, UK

Illtud Harri
M +44 7920 503 600

David Outhwaite
M +44 7787 597 493

Media Relations, Americas

Matthew Klar
T +1 514 608 4429

Investor Relations, UK

Menno Sanderse
M: +44 7825 195 178

David Ovington
M +44 7920 010 978

Clare Peever
M +44 7788 967 877

Media Relations, Australia

Jonathan Rose
M +61 447 028 913

Matt Chambers
M +61 433 525 739

Jesse Riseborough
M +61 436 653 412

Investor Relations, Australia

Natalie Worley
M +61 409 210 462

Amar Jambaa
M +61 472 865 948

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom

T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 7, 360 Collins Street
Melbourne 3000
Australia

T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

Rio Tinto

LSE:RIO

Release Summary
Rio Tinto updates details of tailings facilities
Release Versions

Contacts

Please direct all enquiries to media.enquiries@riotinto.com

Media Relations, UK

Illtud Harri
M +44 7920 503 600

David Outhwaite
M +44 7787 597 493

Media Relations, Americas

Matthew Klar
T +1 514 608 4429

Investor Relations, UK

Menno Sanderse
M: +44 7825 195 178

David Ovington
M +44 7920 010 978

Clare Peever
M +44 7788 967 877

Media Relations, Australia

Jonathan Rose
M +61 447 028 913

Matt Chambers
M +61 433 525 739

Jesse Riseborough
M +61 436 653 412

Investor Relations, Australia

Natalie Worley
M +61 409 210 462

Amar Jambaa
M +61 472 865 948

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom

T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 7, 360 Collins Street
Melbourne 3000
Australia

T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

More News From Rio Tinto

Rhodes Ridge Joint Venture partners begin $191 million feasibility study on up to 50Mtpa Pilbara iron ore mine

PERTH, Australia--(BUSINESS WIRE)--The Rhodes Ridge Joint Venture has approved a $191 million (A$294 million) (Rio Tinto share $96 million, A$147 million) feasibility study to progress development of the first phase of the Rhodes Ridge project, one of the world’s best undeveloped iron ore deposits, in Western Australia’s Pilbara. The feasibility study will assess development of an operation with initial annual production capacity of 40 to 50 million tonnes of iron ore. The joint venture partner...

Yinhawangka Aboriginal Corporation and Rio Tinto sign Interim Modernised Agreement

PERTH, Australia--(BUSINESS WIRE)--Yinhawangka Aboriginal Corporation and Rio Tinto have signed an Interim Modernised Agreement, marking an important step in their long-standing relationship. This interim agreement builds on the 2013 Participation Agreement between the Yinhawangka People and Rio Tinto. It sets out how both parties will work together and establishes a pathway to a fuller modernised agreement that will govern how Rio Tinto operates on Yinhawangka Country for the long term. The ag...

Rio Tinto’s first Pilbara-made rail car built by Gemco in Karratha

KARRATHA, Australia--(BUSINESS WIRE)--Rio Tinto’s first Pilbara-made iron ore rail car has rolled off the production line in Karratha, as part of a A$150 million partnership with Australian rail industry supplier Gemco Rail to build 100 rail cars in Western Australia and to support local manufacturing. The first Karratha-made rail car follows the completion of 40 Western Australian-made iron ore rail cars under the partnership at Gemco Rail’s Perth facility earlier this year, with the remaining...
Back to Newsroom