-

Rio Tinto achieves battery grade lithium production at Boron plant

BORON, Calif.--(BUSINESS WIRE)--Rio Tinto has commenced production of battery-grade lithium from waste rock at a lithium demonstration plant at the Boron mine site in California, United States.

The demonstration plant is the next step in scaling up a breakthrough lithium production process developed at Boron, to recover the critical mineral and extract additional value out of waste piles from over 90 years of mining at the operation.

An initial small-scale trial in 2019 successfully proved the process of roasting and leaching waste rock to recover high grades of lithium.

The demonstration plant has a design capacity of 10 tonnes per year of battery grade lithium. It will be run throughout 2021 to optimise the process and inform Rio Tinto’s feasibility assessment for progressing to a production scale plant with an initial capacity of at least 5,000 tonnes per year, or enough to make batteries for approximately 70,000 electric vehicles.

Rio Tinto Minerals chief executive Sinead Kaufman said “This is a valuable next step in scaling up our production of lithium at the Boron site, all from using waste material without the need for further mining. It shows the innovative thinking we are applying across our business to find new ways to meet the demand for emerging commodities like lithium, which are part of the transition to a low-carbon future.”

Rio Tinto’s lithium pipeline includes the Jadar lithium-borate project in Serbia, for which a feasibility study is expected to complete by the end of 2021.

Development of the lithium project at Boron draws on Rio Tinto’s long standing partnership with the U.S. Department of Energy’s Critical Materials Institute (CMI), which is focussed on discovering ways to economically recover critical mineral by-products from existing refining and smelting processes. CMI experts worked alongside Rio Tinto technical leads to help solve a number of key processing challenges to produce battery grade lithium at Boron.

riotinto.com

Follow @RioTinto on Twitter

Contacts

Contacts
media.enquiries@riotinto.com

Media Relations, United Kingdom
Illtud Harri
M +44 7920 503 600
David Outhwaite
T +44 20 7781 1623
M +44 7787 597 493

Media Relations, Americas
Matthew Klar
T +1 514 608 4429

Media Relations, Asia
Grant Donald
T +65 6679 9290
M +65 9722 6028

Media Relations, Australia
Jonathan Rose
T +61 3 9283 3088
M +61 447 028 913
Matt Chambers
T +61 3 9283 3087
M +61 433 525 739
Jesse Riseborough
T +61 8 6211 6013
M +61 436 653 412

Investor Relations, United Kingdom
Menno Sanderse
T: +44 20 7781 1517
M: +44 7825 195 178
David Ovington
T +44 20 7781 2051
M +44 7920 010 978
Clare Peever
M: +44 7788 967 877

Investor Relations, Australia
Natalie Worley
T +61 3 9283 3063
M +61 409 210 462
Amar Jambaa
T +61 3 9283 3627
M +61 472 865 948

Group Company Secretary
Steve Allen

Joint Company Secretary
Tim Paine

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 7, 360 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

Category: Boron

Rio Tinto

LSE:RIO

Release Versions

Contacts

Contacts
media.enquiries@riotinto.com

Media Relations, United Kingdom
Illtud Harri
M +44 7920 503 600
David Outhwaite
T +44 20 7781 1623
M +44 7787 597 493

Media Relations, Americas
Matthew Klar
T +1 514 608 4429

Media Relations, Asia
Grant Donald
T +65 6679 9290
M +65 9722 6028

Media Relations, Australia
Jonathan Rose
T +61 3 9283 3088
M +61 447 028 913
Matt Chambers
T +61 3 9283 3087
M +61 433 525 739
Jesse Riseborough
T +61 8 6211 6013
M +61 436 653 412

Investor Relations, United Kingdom
Menno Sanderse
T: +44 20 7781 1517
M: +44 7825 195 178
David Ovington
T +44 20 7781 2051
M +44 7920 010 978
Clare Peever
M: +44 7788 967 877

Investor Relations, Australia
Natalie Worley
T +61 3 9283 3063
M +61 409 210 462
Amar Jambaa
T +61 3 9283 3627
M +61 472 865 948

Group Company Secretary
Steve Allen

Joint Company Secretary
Tim Paine

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 7, 360 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

Category: Boron

More News From Rio Tinto

BHP and Rio Tinto welcome first Caterpillar battery-electric haul trucks to the Pilbara

PERTH, Australia--(BUSINESS WIRE)--Australia’s first Cat® 793 XE Early Learner battery-electric haul trucks have arrived at BHP’s Jimblebar iron ore mine in the Pilbara, marking the start of on-site testing, in collaboration with Rio Tinto, of Caterpillar’s battery-electric heavy haulage technology in the region that powers the nation’s economy. The two Early Learner trucks, delivered through an industry-first collaboration between BHP, Rio Tinto and Caterpillar represent a major step toward a...

Rio Tinto’s Nuton technology produces first copper

TUCSON, Arizona--(BUSINESS WIRE)--Rio Tinto has successfully produced the first copper from the Johnson Camp mine in Arizona using its Nuton® Technology, marking a pivotal step forward in the development of this innovative copper processing technology. After more than 30 years of research and development, the first copper cathode using Rio Tinto’s proprietary bioleaching technology, which relies on microorganisms grown on site, was produced at Gunnison Copper’s Johnson Camp mine last month. The...

Stronger, sharper and simpler Rio Tinto to deliver leading returns

LONDON--(BUSINESS WIRE)--Rio Tinto will today outline its strategy to deliver industry leading returns by becoming stronger, sharper and simpler, at its 2025 Capital Markets Day. Chief Executive Simon Trott and members of the executive team will detail how Rio Tinto will unlock its full potential to become the most valued metals and mining business through a strategy that starts with having the right assets in the right markets, supported by a diversified model that delivers market-leading perf...
Back to Newsroom