-

Granite Awarded $18 Million Contract for University of California, Santa Cruz Renewal Project

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced today that it has been awarded a sub-contract by Swinerton for the University of California, Santa Cruz (UCSC) Kresge College Work Package #4. The $18 million contract is anticipated to be included in Granite's fourth quarter 2020 backlog.

This is the second project Granite has been awarded as part of UCSC’s multi-year Kresge College Renewal Project. Scope of work for Package #4 includes the construction of the retaining walls around four new buildings including the relocation of the sewer service, storm drain and detection cisterns, electrical power, and communications network. Granite will also renovate and update the North Bridge, a pedestrian walkway connecting the future academic plaza to Heller Drive.

“This is one of two campus projects designed to increase student enrollment while minimizing impacts to the local housing market,” said Granite Area Manager Penn Shortes. “We are pleased to continue our partnership with Swinerton and UCSC on their Kresge campus renewal project.”

Construction materials for the project including aggregates will be supplied by Granite’s nearby Felton Facility.

Construction is expected to begin in November 2020, and expected to conclude in early 2022.

About Granite

Granite is America’s Infrastructure Company™. Incorporated since 1922, Granite (NYSE:GVA) is one of the largest diversified construction and construction materials companies in the United States as well as a full-suite provider in the transportation, water infrastructure and mineral exploration markets. Granite’s Code of Conduct and strong Core Values guide the Company and its employees to uphold the highest ethical standards. In addition to being one of the World’s Most Ethical Companies for eleven consecutive years, Granite is an industry leader in safety and an award-winning firm in quality and sustainability. For more information, visit the Granite website, and connect with Granite on LinkedIn, Twitter, Facebook and Instagram.

Contacts

Media
Erin Kuhlman 831-768-4111
Investors
Lisa Curtis 831-728-7532

Granite

NYSE:GVA

Release Versions

Contacts

Media
Erin Kuhlman 831-768-4111
Investors
Lisa Curtis 831-728-7532

Social Media Profiles
More News From Granite

Granite Reports Third Quarter 2026 Results and Introduces 2029 Targets

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE: GVA) today announced results for the quarter ended September 30, 2026. Third Quarter 2026 Results Net income attributable to Granite totaled $3 million, or $0.07 per diluted share, compared to net income attributable to Granite of $103 million, or $1.98 per diluted share, for the same period in the prior year. Current period net income was unfavorably impacted by $162 million of net non-operating charges associated with settling the conversio...

Granite Awarded SR 202 Widening and Trestle Replacement Project

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced today that it has been awarded the SR 202 Widening and Trestle Replacement Project - Phase B by the City of Woodinville, Washington. The contract is valued at approximately $16 million and will be included in Granite's fourth quarter 2026 CAP. The project will widen SR 202/131st Avenue NE between NE 177th Street and NE 175th Street from five lanes to eight lanes, and replace the existing railroad trestle with a new, unique arched...

Granite Awarded Aircraft Arresting System Project in Florida

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced today that it has been awarded a contract by the U.S. Army Corps of Engineers (USACE) for the construction of a BAK-12/14 aircraft arresting system at Homestead Air Reserve Base in Homestead, Florida. The project is valued at approximately $11 million and will be included in Granite’s third quarter 2026 CAP. Granite’s scope of work includes constructing and installing the BAK-12/14 aircraft arresting system, which provides a cri...
Back to Newsroom