-

Announcing Granite’s CM/GC Rehabilitation and Construction Project at SFO

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced its Construction Manager/General Contractor (CM/GC) project with San Francisco International Airport (SFO) for the Runway 1R-19L Rehabilitation and Taxiway W Construction Project. This project is a key component of SFO's Capital Improvement Program (CIP), a multi-billion-dollar initiative to modernize and improve the airport's infrastructure, including runways, taxiways, and terminals.

Project Timeline:

  • Preconstruction: June 2025 through January 2026
  • Major Construction: March 2026 through November 2026

The project will rehabilitate Runway 1R-19L and construct Taxiway W between Taxiway A and Taxiway L. It includes upgrades to the hot mix asphalt pavement, lighting infrastructure, drainage, signage, Runway Status Lights (RWLS), sectionals, grooving, and striping. The existing Taxiway F1 will be demolished, and a new Taxiway W will be constructed.

“We are committed to building a lasting collaboration with SFO and all stakeholders to deliver this critical infrastructure efficiently and effectively, while minimizing disruptions for both employees and SFO passengers,” said Granite Vice President of Regional Operations Brent Fogg. “We are honored to partner with the exceptional SFO team to enhance the airfield and uphold SFO’s reputation as the Best Airport in North America.”

Granite will supply asphalt from its Santa Clara Asphalt facility, approximately 185,000 tons of P401 and P403 Mix.

The total anticipated construction value is estimated at $115 million and was included in Granite's second-quarter CAP. The project is expected to begin in March 2026 and continue through November 2026.

About Granite

Granite is America’s Infrastructure Company™. Incorporated since 1922, Granite (NYSE:GVA) is one of the largest diversified construction and construction materials companies in the United States as well as a full-suite civil construction provider. Granite’s Code of Conduct and strong Core Values guide the Company and its employees to uphold the highest ethical standards. Granite is an industry leader in safety and an award-winning firm in quality and sustainability. For more information, visit the Granite website, graniteconstruction.com, and connect with Granite on LinkedIn, X, Facebook, and Instagram.

Contacts

Granite Contacts

Media
Erin Kuhlman 831-768-4111
Investors
Wenjun Xu - 831-761-7861

Granite

NYSE:GVA

Release Versions

Contacts

Granite Contacts

Media
Erin Kuhlman 831-768-4111
Investors
Wenjun Xu - 831-761-7861

More News From Granite

Granite Reports Third Quarter 2025 Results

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE: GVA) today announced results for the quarter ended September 30, 2025. Third Quarter 2025 Results Net income attributable to Granite totaled $103 million, or $1.98 per diluted share, compared to net income attributable to Granite of $79 million, or $1.57 per diluted share, for the same period in the prior year. Adjusted net income attributable to Granite (2) totaled $124 million, or $2.70 per diluted share, compared to adjusted net income att...

Granite Selected for I-290 Drainage Improvements Under IDOT’s First CM/GC Contract

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced its selection by the Illinois Department of Transportation (IDOT) for a Construction Manager/General Contractor (CM/GC) contract for the I-290 Drainage Improvements Project in Chicago, Illinois. This federally funded initiative will be included in Granite’s third quarter CAP. The project includes the installation of 3.3 miles of new trunk sewer, with diameters reaching up to 90 inches, the construction of new detention systems,...

Granite Launches GMP 4 at Tucson International Airport, Expanding Airfield Safety Enhancement Program

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) has announced the award of a contract valued at approximately $70 million by the Tucson Airport Authority (TAA) for work at Tucson International Airport (TUS). This contract represents a significant development within TAA’s estimated $400 million multi-year Airfield Safety Enhancement (ASE) Program. It is the fourth Guaranteed Maximum Price (GMP 4) work package granted under TAA’s ongoing Construction Manager at Risk project. Project fund...
Back to Newsroom