-

E3 Lithium Outlines Inaugural 2.5 Mt LCE Inferred Mineral Resource within the Estevan Lithium District in Saskatchewan

Highlights:

  • The Technical Report outlines an inferred mineral resource of just over 2.5 million tonnes of lithium carbonate equivalent (LCE)
  • E3 Lithium holds approximately 67,000 hectares of land within the Estevan Lithium District
  • The lithium concentrations near E3 Lithium’s Land holdings are reported to be as high as 259 mg/L

CALGARY, Alberta--(BUSINESS WIRE)--E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), “E3 Lithium” or the “Company,” a leader in Canadian lithium, is pleased to announce the inaugural inferred mineral resource of ~2.5 million tonnes of lithium carbonate equivalent (LCE) contained within the Estevan Lithium District located in southeast Saskatchewan.

E3 Lithium acquired its Saskatchewan property in 2021, situated near the city of Estevan. The Company’s permit area covers approximately 67,000 hectares of crown mineral permits within the Estevan Lithium District. Recent lithium exploration near E3 Lithium’s land holdings have shown high lithium concentrations, including up to 259 mg/L in the Duperow Formation.

“The resource over our Saskatchewan Property represents an exciting development prospect for E3 Lithium and reinforces the Company’s position for Lithium development in Western Canada, adding to our globally significant lithium resources,” said Chris Doornbos, President and CEO of E3 Lithium. “Saskatchewan is still maturing its resources base and this inaugural 2.5 Mt LCE resource adds to this new and developing lithium jurisdiction.”

The technical report will be available on the Company’s website (e3lithium.ca/technical-reports) and SEDAR (www.sedar.com) within 45 days of this announcement.

The disclosure in this news release of scientific and technical information pertaining to the Saskatchewan Property has been reviewed and approved by Alex Haluszka, a Principal Hydrogeologist of Matrix Solutions Inc. and Jason Clarke, a Geologist of Matrix Solutions Inc. Mr. Haluszka and Mr. Clarke are “qualified person’s” as defined under NI 43-101.

Resource Estimate

The elevated lithium concentrations of interest exist within the Duperow Formation, which was broken down into six distinctive zones based on geological characteristics. The resource estimate has been calculated across E3 Lithium’s permits within the Estevan Lithium District and was developed in stages.

First, data complication and review of existing reports within the Estevan Lithium District were conducted. Then, a reservoir depositional framework was developed based on core descriptions and lithofacies analysis. Thirdly, petrophysical modeling on geophysical wireline logs, validated against core analysis where possible, was performed. Finally, geological maps were generated, and leveraged for reservoir volume calculations.

The mineral resource estimate for the Estevan property is summarized in the table below. The mineral resource is considered inferred due to the geological evidence being sufficient to imply but not verify geological grade, or quality continuity.

Interval

Brine Volume
(m3)

Average
Li Grade (mg/L)

OLIP (t)

LCE (t)

Seward

898,000,000

99

89,000

473,000

Flat Lake Evaporite

0

N/A

0

0

Upper Wymark

630,000,000

120

76,000

402,000

Middle Wymark

2,541,000,000

101

257,000

1,366,000

Lower Wymark

398,000,000

68

27,000

144,000

Saskatoon

624,000,000

48

30,000

159,000

Total

5,091,000,000

 

478,000

2,545,000

The mineral resource estimate was completed by a multi-disciplinary team led by E3 Lithium and supervised by Alex Haluszka and Jason Clarke of Matrix Solutions Inc. acting as QP. The estimate was completed using volumetric analysis based on geological parameters of reservoir geometry, effective porosity, permeability, and dissolved lithium concentrations. The mineral resource estimate benefited from a considerable amount of data compiled by the oil and gas industry and made public by the Government of Saskatchewan. Key data sets used to determine reservoir brine parameters in the resource area include: core plug analyses (effective porosity/‘PhiE’ and permeability), and wireline logs (lithology, total porosity/‘PhiT’ and relative permeability).

To calculate the brine volume for each zone within the Duperow, the E3 Lithium permit area was multiplied by the net reservoir thickness (P50 value, using a 2% porosity cut-off), multiplied by the effective porosity (P50 value, above the 2% cut-off), multiplied by the expected brine saturation in the reservoir (99%). From there, the Original Lithium in Place (OLIP) is calculated by multiplying by the lithium concentration (P50 value for each zone).

ON BEHALF OF THE BOARD OF DIRECTORS
Chris Doornbos, President & CEO
E3 Lithium Ltd.

About E3 Lithium

E3 Lithium is a development company with a total of 16.0 million tonnes of lithium carbonate equivalent (LCE) Measured and Indicated and 0.9 million tonnes LCE Inferred mineral resources1 in Alberta. As outlined in E3’s Preliminary Economic Assessment, the Clearwater Lithium Project has an NPV8% of USD 1.1 Billion with a 32% IRR pre-tax and USD 820 Million with a 27% IRR after-tax1. E3 Lithium’s goal is to produce high purity, battery grade lithium products to power the growing electrical revolution. With a significant lithium resource and innovative technology solutions, E3 Lithium has the potential to deliver lithium to market from one of the best jurisdictions in the world.

1: The Preliminary Economic Assessment (PEA) for the Clearwater Lithium Project NI 43-101 technical report is amended Sept 17, 2021. Gordon MacMillan, P.Geol, QP, Fluid Domains Inc. and Grahame Binks, MAusIMM, QP (Metallurgy), formerly of Sedgman Canada Limited (Report Date: June 15, 2018, Effective Date: June 4, 2018 Amended Date: September 17, 2021). The mineral resource NI 43-101 Technical Report for the North Rocky Property, effective October 27, 2017, identified 0.9Mt LCE (inferred). The mineral resource NI 43-101 Technical Report for the Bashaw District Project, effective March 21, 2023, identified 16.0Mt LCE (measured & indicated). All reports are available on the E3 Lithium’s website (e3lithium.ca/technical-reports) and SEDAR+ (www.sedarplus.ca).

Forward-Looking and Cautionary Statements

This news release includes certain forward-looking statements as well as management’s objectives, strategies, beliefs and intentions. Forward looking statements are frequently identified by such words as “may”, “will”, “plan”, “expect”, “anticipate”, “estimate”, “intend” and similar words referring to future events and results. Forward-looking statements are based on the current opinions and expectations of management. All forward-looking information is inherently uncertain and subject to a variety of assumptions, risks and uncertainties, including the speculative nature of mineral exploration and development, fluctuating commodity prices, the effectiveness and feasibility of emerging lithium extraction technologies which have not yet been tested or proven on a commercial scale or on the Company’s brine, competitive risks and the availability of financing, as described in more detail in our recent securities filings available at www.sedarplus.ca. Actual events or results may differ materially from those projected in the forward-looking statements and we caution against placing undue reliance thereon. We assume no obligation to revise or update these forward-looking statements except as required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts

E3 Lithium - Investor and Media Relations
Chris Doornbos
President & CEO
investor@e3lithium.ca
587-324-2775

E3 Lithium Ltd.

TSX VENTURE:ETL

Release Versions
$Cashtags

Contacts

E3 Lithium - Investor and Media Relations
Chris Doornbos
President & CEO
investor@e3lithium.ca
587-324-2775

Social Media Profiles
More News From E3 Lithium Ltd.

E3 Lithium Successfully Completes the Drilling Portion of Its Phase 2 Demonstration Program and Provides a Leadership Update

CALGARY, Alberta--(BUSINESS WIRE)--E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), (“E3 Lithium” or the “Company”) a leader in Canadian lithium development, has successfully drilled its brine production and injection wells at its Demonstration Facility in central Alberta. This achievement marks a milestone in Phase 2 of the Company’s Demonstration Facility program. The vertical production and deviated injection wells are E3 Lithium’s third and fourth wells into the Leduc Formation, and t...

E3 Lithium Releases Third Quarter 2025 Financial Results

CALGARY, Alberta--(BUSINESS WIRE)--E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), “E3 Lithium” or the “Company,” a leader in Canadian lithium, filed its unaudited consolidated financial statements for the three-month period ended September 30, 2025, and the accompanying Management Discussion and Analysis (“MD&A”) on SEDAR www.sedarplus.ca. Additionally, E3 Lithium has updated its corporate presentation that, along with the financial statements and MD&A, will be available on E3 L...

E3 Lithium Hosting Quarterly Webinar “Take-Two” on November 6, 2025 @ 9:00am MT

CALGARY, Alberta--(BUSINESS WIRE)--E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), (“E3 Lithium” or the “Company”) a leader in Canadian lithium development is rescheduling its Q4 Webinar for Thursday, November 6, 2025, at 9:00am MT (11:00am ET). Unfortunately, there were some technical difficulties with both the hosting and the recording of our Q4 Webinar this morning. As a result, E3 Lithium invites all interested parties to join a “take-two” of the Webinar tomorrow morning. During the...
Back to Newsroom