-

HSGS-Ameresco Awarded Microgrid Project with White Sands Missile Range

Construction of the microgrid will provide power to energize the water wells at the military test facility

FRAMINGHAM, Mass. & WHITE SANDS, N.M.--(BUSINESS WIRE)--HSGS-Ameresco, LLC, a joint venture certified as a Service-Disabled Veteran Owned Small Business (SDVOSB) by the Small Business Administration and the Department of Veterans Affairs (VA), today announced that it has been awarded a contract to install a microgrid system at the White Sands Missile Range (WSMR), the Department of Defense’s largest open-air military test facility in New Mexico.

The new microgrid system is for several of the base’s potable water wells and is designed to include a new 700kW solar photovoltaic array, a 500kW natural gas generator and a 500kW battery energy storage system. The system is designed to provide 14 days of power to energize the water wells in the event of a power outage, supporting critical missions at the Army Research Lab, Material Test Directorate, fire department, and a Fort Bliss power projection platform.

“We are excited to implement this project to enhance the reliability of WSMR’s energy system,” said Dave McNeil, President and CEO of HSGS-Ameresco. “This diverse solution set will strengthen the base’s energy and water resilience, so that it is no longer dependent on a single source of power.”

The scope of the project also features updated electrical panels, transformers and controls; a fiber optic communication line, a fire alarm system, meters, cyber security measures, anti-terrorism measures and security fencing, among others. HSGS-Ameresco will provide all supervision, labor, materials, equipment, supplies and transportation necessary to perform the microgrid project.

“We’re thrilled to have been selected as a partner on this project for a site that is so important to our national security,” said Nicole Bulgarino, Executive Vice President, Ameresco. “This micro-grid system is designed to enable the base to provide continuous power during a loss of utility event for wells on site that provide critical water supply to the installation.”

Construction is set to begin in December 2022 and is expected to reach completion by late 2023.

To learn more about the energy efficiency solutions offered by Ameresco, visit www.ameresco.com/energy-efficiency/.

About HSGS-Ameresco

HSGS-Ameresco, LLC, a joint venture certified as a Service-Disabled Veteran Owned Small Business (SDVOSB) by the Small Business Administration and the Department of Veterans Affairs (VA), delivers energy generation, smart controls, and building efficiency solutions to the VA and other Federal agencies nationwide. The HSGS-Ameresco team has extensive Federal contracting expertise, specializing in design-build services, energy savings performance contracts (ESPC), and Energy Supply Agreements (ESAs)/Power Purchase Agreements (PPAs). The company helps Federal agencies reduce their energy consumption and carbon footprint, assure their missions, improve their energy security and resiliency postures, and meet and exceed statutory requirements regarding energy management and the sustainability of Federal facilities.

About White Sands Missile Range

Comprised of 3,200 squares miles (roughly the size of Rhode Island and Delaware) White Sands Missile Range supports the Army, Navy and Air Force, as well as commercial and international users on a reimbursable basis while conducting more than 3,000 tests annually. The mission at White Sands Missile Range begins with a customer, a service developer, a foreign ally or another federal agency ready to find out if their engineers and scientists have built something that will perform according to job specifications. It ends when an exhaustive series of test have been completed and a data report has been delivered to the customer.

The announcement of a customer’s entry into project contract is not necessarily indicative of the timing or amount of revenue from such contract, of the company’s overall revenue for any particular period or of trends in the company’s overall total project backlog. Ameresco’s portion of this project was not included in our previously reported contracted backlog as of June 30, 2022.

Contacts

Media:
Ameresco: Leila Dillon, 508-661-2264, news@ameresco.com

Ameresco, Inc. Logo
Ameresco, Inc. Logo

Ameresco, Inc.

NYSE:AMRC

Release Summary
HSGS-Ameresco awarded microgrid project with White Sands Missile Range.
Release Versions

Contacts

Media:
Ameresco: Leila Dillon, 508-661-2264, news@ameresco.com

Social Media Profiles
More News From Ameresco, Inc.

Ameresco to Announce Fourth Quarter and Full Year 2025 Financial Results on March 2, 2026

FRAMINGHAM, Mass.--(BUSINESS WIRE)--Ameresco, Inc., (NYSE: AMRC), a leading energy infrastructure solutions provider, today announced that it will release its fourth quarter and full year 2025 financial results after the close of the market on Monday, March 2, 2026. The earnings press release will be available on the “Investor Relations” section of the Company’s website at www.ameresco.com. The Company will host an earnings conference call at 4:30 p.m. EST the same day. In conjunction with its...

Ameresco and Republic Services Bring 5.2 MWe Upper Rock Landfill Gas-to-Renewable Natural Gas Facility Online

FRAMINGHAM, Mass. & EAST MOLINE, Ill.--(BUSINESS WIRE)--Ameresco, Inc., (NYSE: AMRC), a leading energy infrastructure solutions provider, and Republic Services, Inc. (NYSE: RSG), a leader in the environmental services industry, today announced it achieved operation of a renewable natural gas (RNG) facility located at the Upper Rock Island County Landfill in East Moline, Illinois in December. The Ameresco-owned asset will upgrade landfill gas (LFG) from the Upper Rock Landfill into pipeline-qual...

Ameresco Develops On-site Solar for Orange Unified School District

FRAMINGHAM, Mass. & ORANGE, Calif.--(BUSINESS WIRE)--Ameresco, Inc., (NYSE: AMRC), a leading energy infrastructure solutions provider, and Orange Unified School District (OUSD) today announced the completion of a solar photovoltaic rooftop and carport installation project spanning seven schools. The project is anticipated to generate $6.3 million in savings for the school district over 25 years. Ameresco developed the rooftop and carport canopy solar PV systems for Orange Unified School Distric...
Back to Newsroom