-

Granite to Restore Calabazas Creek Near Cupertino

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced today that it has been awarded the approximately $15 million contract for restoration work on Calabazas Creek near Cupertino, California. Awarded by the Santa Clara Valley Water District, this project will enhance flood control along the creek. The award is anticipated to be included in Granite’s second quarter CAP.

The purpose of the project is to repair a number of earthen channel failures along 4500 linear feet of streambed that could potentially encroach on residential properties. These repairs entail a combination of channel sidewall repairs using ½ ton rock slope protection and other repairs utilizing heavy steel sheet piling walls to be constructed using the hydraulic “press in” method. The project will cover 10 separate repair sites and include approximately 7000 cubic yards of channel excavation and backfill with 2300 tons of ½ ton rock slope protection. For the steel piling walls, Granite will use the Gilken “Silent Driver” for sheet driving, eliminating the impact and vibration usually associated with this type of piling installation and reducing impact to surrounding residences.

“We’re excited to have another unique flood control project with Valley Water,” said Brent Fogg, vice president of regional operations. “This type of project is important for improving community resilience and aligns with our sustainability goals. Granite has established a great working relationship with Valley Water and we look forward to delivering this important flood control project for the community.”

The project is anticipated to start in July 2022 and anticipated to complete in December 2023.

About Granite

Granite is America’s Infrastructure Company™. Incorporated since 1922, Granite (NYSE:GVA) is one of the largest diversified construction and construction materials companies in the United States as well as a full-suite civil construction provider. Granite’s Code of Conduct and strong Core Values guide the Company and its employees to uphold the highest ethical standards. Granite is an industry leader in safety and an award-winning firm in quality and sustainability. For more information, visit the Granite website, graniteconstruction.com, and connect with Granite on LinkedIn, Twitter, Facebook, and Instagram.

Contacts

Granite
Media
Erin Kuhlman 831-768-4111
Investors
Wenjun Xu - 831-761-7861

Granite

NYSE:GVA

Release Versions

Contacts

Granite
Media
Erin Kuhlman 831-768-4111
Investors
Wenjun Xu - 831-761-7861

More News From Granite

Granite Reports Third Quarter 2025 Results

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE: GVA) today announced results for the quarter ended September 30, 2025. Third Quarter 2025 Results Net income attributable to Granite totaled $103 million, or $1.98 per diluted share, compared to net income attributable to Granite of $79 million, or $1.57 per diluted share, for the same period in the prior year. Adjusted net income attributable to Granite (2) totaled $124 million, or $2.70 per diluted share, compared to adjusted net income att...

Granite Selected for I-290 Drainage Improvements Under IDOT’s First CM/GC Contract

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) announced its selection by the Illinois Department of Transportation (IDOT) for a Construction Manager/General Contractor (CM/GC) contract for the I-290 Drainage Improvements Project in Chicago, Illinois. This federally funded initiative will be included in Granite’s third quarter CAP. The project includes the installation of 3.3 miles of new trunk sewer, with diameters reaching up to 90 inches, the construction of new detention systems,...

Granite Launches GMP 4 at Tucson International Airport, Expanding Airfield Safety Enhancement Program

WATSONVILLE, Calif.--(BUSINESS WIRE)--Granite (NYSE:GVA) has announced the award of a contract valued at approximately $70 million by the Tucson Airport Authority (TAA) for work at Tucson International Airport (TUS). This contract represents a significant development within TAA’s estimated $400 million multi-year Airfield Safety Enhancement (ASE) Program. It is the fourth Guaranteed Maximum Price (GMP 4) work package granted under TAA’s ongoing Construction Manager at Risk project. Project fund...
Back to Newsroom