DUBLIN--(BUSINESS WIRE)--Research and Markets has announced the addition of the "Global Nuclear Reactor Construction Market 2017-2021" report to their offering.
The global nuclear reactor construction market to grow at a CAGR of 5.19% during the period 2017-2021.
The report, Global Nuclear Reactor Construction Market 2017-2021, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.
According to the report, one of the major drivers for this market is prefabricated structure gaining prominence. Prefabricated structures help reduce the cost and period of construction, which are apparently very high for nuclear reactors. Nuclear projects such as Flamanville 3 in France is behind its construction schedule, which resulted in the increasing cost of the overall project. A prefabricated structure includes an assembly of piping, valves, ladders, structural elements, supports, reinforced bar mats, ducting, and others. Structures may be fabricated in a factory, while civil works continue on-site. The civil work includes the preparation to receive prefabricated structures.
Key vendors
- AREVA
- GE Hitachi Nuclear Energy
- KEPCO
- Mitsubishi Heavy Industries
-
ROSATOM
Other Prominent Vendors
- AECOM
- Ansaldo Nucleare
- Atomstroyexport
- Bechtel
-
Others
Key Topics Covered:
PART 01: Executive summary
PART 02: Scope of the report
PART 03: Research Methodology
PART 04: Introduction
PART 05: Market landscape
PART 06: Market segmentation by type
PART 07: Geographical segmentation
PART 08: Drivers and challenges
PART 09: Market trends
PART 10: Vendor landscape
PART 11: Key vendor analysis
PART 12: Appendix
For more information about this report visit http://www.researchandmarkets.com/research/5bmpj4/global_nuclear