Findings from boiler spine inspections at Heysham 1 nuclear power station

LONDON--()--

11 August 2014

FINDINGS FROM BOILER SPINE INSPECTIONS AT HEYSHAM 1 NUCLEAR POWER STATION

Centrica notes the statement issued this morning by EDF Energy in connection with the findings from boiler spine inspections at Heysham 1 nuclear power station. Centrica has a 20% interest in EDF Energy's existing nuclear operations.

On this basis, the resulting reduction in output from the affected nuclear power stations is currently estimated to reduce Centrica's earnings per share in 2014 by around 0.3 pence per share.

ENDS

 
Enquiries:
Centrica Investor Relations +44 (0) 1753 494900
Centrica Media Relations +44 (0) 800 107 7014

Short Name: Centrica plc
Category Code: MSC
Sequence Number: 428394
Time of Receipt (offset from UTC): 20140810T193554+0100

Contacts

Centrica plc

Contacts

Centrica plc