DENVER & PERTH, Australia--()--Samson Oil & Gas Limited (ASX: SSN; NYSE MKT: SSN):

TOTAL COMPANY PRODUCTION

Samson net production for 2014 is as follows:

                     
    JAN   FEB   MARCH   APRIL   MAY
OIL, BO   5,767   12,180   11,154   15,775   16,654
GAS, MCF   16,323   17,016   13,067   11,345   10,720
BOE   8,487   15,016   13,332   17,666   18,440
BOEPD   273   536   430   589   595
         

NORTH STOCKYARD PROJECT, WILLIAMS COUNTY, NORTH DAKOTA

The infill development plan for North Stockyard is to drill 8 middle Bakken wells and 8 Three Forks wells. For ease of reference, the current status of each well is set out below with separate tables for each drill pad:

                         
TOFTE 1 PAD   Lateral length   Objective   Status   IP rate BOPD   Avg. Rate BOPD#   Cum to Date BO

Billabong

2-13-14HBK

  6,147 ft.   Bakken   Work over commenced   NA   NA   NA

Sail and Anchor
4-13-14HBK

  6,375 ft.   Bakken   Shut in   1,323   304   39,142
Blackdog

3-13-14 HBK

  8,383 ft.   Bakken   Flowing   1,995   767   59,498
           
                         
TOFTE 2 PAD   Lateral length   Objective   Status   IP rate BOPD   Avg. Rate BOPD#   Cum to Date BO
Tooheys

4-15-14HBK

  6,740 ft.   Bakken   Pumping   1,078   294   45,843
Coopers

2-15-14HBK

  6,360 ft.   Bakken   Rig on well   556   NA   31,279
Little Creature

3-15-14HBK

  7,578 ft.   Bakken   Pumping   501   427   49,491
 
                         
MATILDA BAY PAD   Lateral length   Objective   Status   IP rate BOPD   Avg. Rate BOPD#   Cum to Date BO
Matilda Bay

2-15-HBK

  4,215 ft.   Bakken   Frack completed   NA   NA   NA
Matilda Bay

1-15-HBK

  4,215 ft.   Bakken   Frack suspended   NA   NA   NA
                         
TF NORTH PAD   Lateral length   Objective   Status   IP rate BOPD   Avg. Rate BOPD#   Cum to Date BO
Bootleg

4-14-15TFH

  7,211 ft.   Three Forks   Drilling completed   NA   NA   NA
Bootleg

5-14-5TFH

  7,495 ft.   Three Forks   Drilling in progress   NA   NA   NA
Ironbank

4-14-3TFH

  7,466 ft.   Three Forks   APD approved   NA   NA   NA
Ironbank

5-14-3TFH

  7,495 ft.   Three Forks   APD approved   NA   NA   NA
           
                         
TF SOUTH PAD   Lateral length   Objective   Status   IP rate BOPD   Avg. Rate BOPD#   Cum to Date BO
Bootleg

6-14-15TFH

  6,867 ft.   Three Forks   APD approved   NA   NA   NA
Bootleg

7-14-15TFH

  6,973 ft.   Three Forks   APD approved   NA   NA   NA
Ironbank

6-14-13TFH

  7,434 ft.   Three Forks   APD in prep   NA   NA   NA
Ironbank

7-14-13TFH

  7,458 ft.   Three Forks   APD in prep   NA   NA   NA
 

#The Avg. Daily rate is an average of the last week’s production or the average after the well was put back into production.

BO: Barrels of oil
BOE: Barrels of oil equivalent (gas converted at its heating value)
BOPD: Barrels of oil per day
MCF: Thousand cubic feet
BOEPD: Barrels of oil equivalent per day
NA: Not available
APD: Application for Permit to Drill
IP Rate: Gross first 24 hour oil rate
Current rate BOPD: Barrels of Oil per Day
Cum to Date: Cumulative gross BO
 

COMMENTARY

Billabong has a work over rig on the well and operations are expected to commence June 3rd.

Sail & Anchor is shut in for the mobilization phase of the work over rig being used on the Billabong well.

The Coopers well has a work over rig on it for a rod pump installation today.

Flow back operations are expected to commence today on both Matilda Bay 2-15HBK and Matilda Bay 1-15HBK wells. Following the flow back on Matilda Bay 1-15H that well bore will have its sleeves drilled out and a series of tests performed to determine the pressure loss point which will then be repaired and the balance of the frack treatment will be conducted as a plug and perforation technique.

The Bootleg 4-14-15TFH has been drilled to its total depth of 18,967 feet (MD) where a 4.5 inch liner was set with a 30 stage sleeve completion.

The Bootleg 5-14-15TFH well is drilling ahead in the Three Forks lateral at 12,409 feet (MD).

Samson’s working interest and its net revenue interest for the North Stockyard Project is set out in the following table:

         
Well   Working interest   Net revenue Interest
Billabong 2-13-14HBK   50.052000%   38.289780%
Sail and Anchor 4-13-14HBK   25.028509%   19.146809%
Blackdog 3-13-14H   24.863526%   19.020597%
Tooheys 4-15-14HBK   28.232033%   21.597505%
Coopers 2-15-14HBK   28.232033%   21.597505%
Little Creature 3-15-14H   27.759719%   21.236185%
Matilda Bay 2-15-H   32.972255%   25.223775%
Matilda Bay 1-15-H   32.972255%   25.223775%
Bootleg 4-14-15TFH   28.386344%   21.715553%
Bootleg 5-14-15TFH   28.386344%   21.715553%
Ironbank 4-14-13TFH   26.746521%   20.461089%
Ironbank 7-14-13TFH   26.746521%   20.461089%
Bootleg 6-14-15TFH*   28.386344%   21.715553%
Bootleg 7-14-15TFH*   28.386344%   21.715553%
Ironbank 6-14-13TFH*   26.746521%   20.461089%
Ironbank 7-14-13TFH*   26.746521%   20.461089%
   

* Wells have yet to be elected by Samson and therefore are subject to change.

BLUFF #1-11 WELL, HAWK SPRINGS PROJECT, GOSHEN COUNTY, WYOMING

The Bluff #1-11 well is drilling ahead at 1,566 feet towards the 7 inch intermediate casing point at around 7,000 feet.

The Bluff Prospect is an important test of the Permian and Pennsylvanian age sections of the Hawk Springs Project. The prospect is defined by a 3-D seismic grid survey which has demonstrated that it can detect the existence of porous sandstones within this prospective geologic section. The Bluff prospect is a four-way dip closed anticlinal structure. Success at Bluff will provide encouragement to test as many as 18 additional prospects that share similar seismic characteristics with Bluff.

Samson’s Ordinary Shares are traded on the Australian Securities Exchange under the symbol "SSN." Samson's American Depository Shares (ADSs) are traded on the New York Stock Exchange MKT under the symbol "SSN." Each ADS represents 20 fully paid Ordinary Shares of Samson. Samson has a total of 2,837 million ordinary shares issued and outstanding (including 230 million options exercisable at AUD 3.8 cents), which would be the equivalent of 141.85 million ADSs. Accordingly, based on the NYSE MKT closing price of US$0.33 per ADS on June 2nd, 2014 the Company has a current market capitalization of approximately US$49.36 million (the options have been valued at an exchange rate of 0.9260). Correspondingly, based on the ASX closing price of A$0.017 for ordinary shares and a closing price of A$0.012 for the 2017 options, on June 2nd, 2014, the Company has a current market capitalization of approximately A$50.9 million.

 

SAMSON OIL & GAS LIMITED

 

TERRY BARR

Managing Director

 

Statements made in this press release that are not historical facts may be forward-looking statements, including but not limited to statements using words like “may,” “believe,” “expect,” “anticipate,” “should” or “will.”

Actual results may differ materially from those projected in any forward-looking statement. There are a number of important factors that could cause actual results to differ materially from those anticipated or estimated by any forward-looking information, including uncertainties inherent in estimating the methods, timing and results of exploration activities. A description of the risks and uncertainties that are generally attendant to Samson and its industry, as well as other factors that could affect Samson’s financial results, are included in the prospectus and prospectus supplement for its recent Rights Offering as well as the Company's report to the U.S. Securities and Exchange Commission on Form 10-K, which are available at www.sec.gov/edgar/searchedgar/webusers.htm.

Contacts

Samson Oil & Gas Limited
Terry Barr, CEO, 303-296-3994 (US office)
970-389-5047 (US cell)

Sharing

Contacts

Samson Oil & Gas Limited
Terry Barr, CEO, 303-296-3994 (US office)
970-389-5047 (US cell)